Vercel Build Exceeds 45-Minute Limit and Gets Cancelled
Your Vercel build runs to 45 minutes and dies with 'Build step did not complete within the maximum of 45 minutes' — usually a cold cache, unbounded page generation, or a hung post-build step. Here's how to find which one.