工作优先级 Prompt:12 个决定"不做什么"的模板

12 个 Prompt 模板按 影响 × 工作量 × 衰减 × 依赖 给周 / 季排序,不只是收件箱重排。

多数优先级最终塌成”哪个最急”。好的 Prompt 强制四维评估,并明确什么被砍。

适合哪些场景

被任务淹的 IC、平衡 IC+ 管理的经理、本季要决定”不做什么”的创业者。

什么时候不建议这样写 Prompt

没把任务全列出别用——基于残缺清单的优先级是空想。

Prompt 结构公式

每个 Prompt 都要带这六个要素:

  • 角色:AI 扮演谁——Chief of Staff / 经理 / 分析师。
  • 上下文:团队 / 组织 / 范围 / 数据。
  • 目标:一个交付物——计划、memo、谈点、文档。
  • 限制:字数、必含字段、受众级别。
  • 语气:自信、中性、事实。
  • 示例:1-2 份过往作品锚定格式。

这套 Prompt 适合用在哪

  • 周任务 triage
  • 季度项目优先
  • 替代艾森豪威尔矩阵
  • 砍 / 转 / 推迟
  • 能量预算分配

12 个可直接复制的 Prompt 模板

1. 影响 × 工作量

Tasks: {tasks}. Score each on IMPACT (1-5) and EFFORT (S / M / L). Output a 2x2: high impact / low effort (do first), high / high (plan), low / low (drop), low / high (don't do). Add 1-sentence rationale per item.

可替换变量: tasks

2. 衰减感知

For each task, classify decay: (a) Compounds if delayed, (b) Stable, (c) Decays (less valuable later). Output: do-soon = Compounding; defer = Stable; drop or do-now = Decaying. Re-rank.

3. 依赖图

Tasks: {tasks}. Map dependencies: which tasks unblock others? Output: (a) Critical path, (b) Tasks that block 2+ others (do these first), (c) Leaf tasks (last).

可替换变量: tasks

4. 砍 / 转 / 推 / 做

For each task, decide: DO (this week), DELEGATE (and to whom + with what brief), DEFER (with calendar date), DROP (and how to communicate to requester). Don't leave anything in limbo.

5. 能量分配

My energy pattern: {pattern}. Group tasks: (a) Deep-work (mornings), (b) Admin (post-lunch slump), (c) Social / meetings (late afternoon). Re-allocate to match energy.

可替换变量: pattern 你的精力分布

6. 季度三优先

For this quarter, identify the 3 priorities that move the most. For each: outcome, success metric, what we won't do in service of this. If you can't name 3, you have too many priorities.

7. 周优先 memo

Write a 5-bullet "this week's priorities" memo: (1) Top priority + why, (2) 2 secondary, (3) What I'm saying no to (and to whom), (4) Decisions needed from others. ≤ 150 words.

8. 说”不”模板

I need to say no to `{request}` from `{requester}`. Write 3 options: (a) hard no with alternative, (b) defer with date, (c) yes-if (negotiate scope). Each ≤ 50 words.

可替换变量: request, requester

9. backlog 梳理

My backlog has {n} items. Sort: (a) actionable in 1 week, (b) actionable in 1 month, (c) > 1 month or unclear (move to "someday"), (d) drop entirely (no longer relevant). Output by bucket.

可替换变量: n

10. maker / manager 日

Today is a maker day (deep work). Or a manager day (meetings). Reflow my task list accordingly: which tasks fit which day? Don't schedule deep work between two meetings.

11. “最小可见胜”过滤

For each big project on my list, identify the smallest visible win this week. Outcome: a tangible artifact (memo, prototype, ticket) that proves momentum. Don't propose hidden work.

12. 周回顾

Last week: planned `{planned}`, completed `{done}`. Audit: (1) Why did I miss what I missed? (2) What surprised me (urgent things), (3) One adjustment for this week.

可替换变量: planned, done

容易踩的坑

  • 没具体上下文——输出泛泛。
  • 不核对——AI 会编。
  • 受众模糊——深浅不当。
  • 没字数限制——读者不读完。
  • 所有场景一个模板——读者麻木。
  • 没”需要什么决定”。
  • 不附原数据。

优化技巧

  • 指明受众级别。
  • 限长:战术 1 页,执行 3 条。
  • 开头先放”要什么决定”。
  • 附原数据链接。
  • 发前念出来。
  • AI 出稿,人审核。
  • 存样本,重用格式、刷新内容。

实操加深

使用这些 prompt 时,不要只替换一个主题词就直接交付。围绕「工作优先级 Prompt:12 个决定”不做什么”的模板」先补齐受众、渠道、长度、语气、参考样例、禁止样式和成功标准,再让模型输出 2 个不同版本做横向比较。好的结果应该能被另一个人直接复用,而不是只有顺滑但空泛的表达。

如果输出看起来像通用模板,下一轮要增加一个真实场景、一个反例和一个可检查指标,例如点击率、转化动作、字数、平台限制或品牌禁区。这样改出来的内容才更像可用资产,而不是一次性的灵感草稿。

FAQ

  • 文档多长?: 战术 1 页,执行 3 条 + 链接。
  • AI 能取代分析师 / 经理吗?: 初稿模板可以;判断不行。
  • 多久刷一次?: 按节奏;受众疲劳就调。
  • 要写风险吗?: 要。装没风险下次失去信任。
  • 怎么核对?: 附数据源;peer 看数字。
  • AI 能自己出数据吗?: 不能。要连真实数据源。

相关阅读

标签: #Prompt #效率 #优先级